Are there any additional costs besides the base rental fee?
In addition to the base rental fee, operating costs at NTB Industrial Park primarily include utilities such as electricity, water supply, wastewater treatment, telecommunications services, and other services depending on actual usage and production requirements.
For general reference, utility-related operating costs may include:
- Electricity: ~1,100 – 3,200 VND/kWh (time-of-use tariff)
- Water supply: ~11,000 VND/m³
- Wastewater treatment: ~2,000 VND/m³
- Telecommunications: from ~300,000 VND/month depending on bandwidth
**Indicative pricing only (excluding VAT), subject to change based on official government tariffs.
Utility and service charges are generally calculated based on actual usage and applicable provider rates, allowing investors to better estimate operational costs.
With integrated infrastructure and pre-assembled factory solutions, much of the setup and infrastructure costs are already factored in. This may help investors plan initial operating and infrastructure costs more efficiently.
Contact NTB to receive a detailed cost breakdown and evaluate the total investment aligned with your production plan.